Skip to content
SATELYX EO-V2 COMMS COMPUTE SLOT SATELYX SATELYX SATELYX
VLEO-1 - Q3/Q4 2027 - Accepting Payloads

Prove Once.
Deploy Everywhere.

IOD/IOV Mission Integrator — Validate. Catalog. Deploy.

We validate space hardware in orbit and turn what works into reusable capability for the next mission.

// THE_FLIGHT_HERITAGE_GAP

Flight Heritage Still Takes a Custom Space Program

To win missions, your hardware needs proof in orbit. Today that usually means building a satellite, accepting a constrained hosted slot, or stitching vendors together yourself.

Path 01

Build a Satellite

$5-15M+, a dedicated systems team, and full mission risk.

Path 02

Accept a Hosted Slot

Limited mass, power, data access, thermal margin, and control.

Path 03

Stitch Vendors Together

Bus, launch, ground, operations, and reporting split across contracts.

// Satelyx route

One IOD/IOV Mission Partner

01

Fit

payload, power, data, thermal

02

Integrate

platform, launch, ground

03

Operate

validation mission

04

Evidence

flight-heritage package

05

Catalog

future deployment

Satelyx designs the validation campaign, integrates your payload, operates the mission, and turns successful hardware into catalog capability.

// THE_CATALOG

Validated Hardware Becomes Deployable Infrastructure

Every successful validation becomes reusable catalog capability. Technology builders earn a path to redeploy; future customers start from flight-proven building blocks.

01 / evidence today

Flight-Proven Base

Earth Observation
heritage data
Edge Compute
heritage data
02 / validating next

VLEO-1 Validation

Earth Observation
mission slot
Edge Compute
mission slot
Propulsion
mission slot
SSA Radar
mission slot
03 / reuse path

Known Building Blocks

EO Payload Stack
repeatable fit
Edge Processing
repeatable fit
Propulsion Interfaces
repeatable fit
Radar Interfaces
repeatable fit
04 / catalog layer

Deployable Entries

Standard Interfaces
ready to package
Flight Evidence
ready to package
Integration Recipes
ready to package
Future Mission Fit
ready to package
Prove once. Deploy everywhere.

The catalog is not a parts list. It is the reusable layer created from validation missions: proof, fit, constraints, and repeatable deployment paths.

Check Fit
// VLEO_1

First Satelyx-Led Catalog Mission

Launch
Q3/Q4 2027
Integration
Q3/Q4 2026
Orbit
VLEO SSO
Payload
~8 kg
Power
50W+
Check Fit
// WHERE_THIS_LEADS

Where the Catalog Leads

Today, partner missions fill the catalog. Next, shared standards make proven technologies easier to plug in and deploy on demand.

Horizon 1 / Now

Validation Engine

  • Partner-funded IOD/IOV missions
  • Standard interfaces and integration recipes
  • Flight data that creates catalog entries
Horizon 2 / Next

Open Access Market

  • Proven modules plug into a shared standard
  • Customers buy capability without starting from zero
  • The catalog becomes the deployment layer
// AI_EDGE_COMPUTE

AI at the Edge of Sensing

Sense

Capture the data in orbit.

Process

Run compute near the payload.

Task

Send the useful signal, not every raw frame.

// THE_TEAM

Built by Mission Operators & Platform Engineers

Matthew Mappin
Matthew Mappin
Co-CEO
Kenneth Tong
Kenneth Tong
Co-CEO
Lucas Lee
Lucas Lee
Co-CTO
Jamie Geddes
Jamie Geddes
Co-CTO
Willy Ko
Willy Ko
COO
Clement Chen
Clement Chen
CSO
Dr. Raymond Tsai
Dr. Raymond Tsai
Chief Scientific Advisor
// BEGIN_YOUR_MISSION

Check Mission Fit

Tell us what you are building. We will review payload fit, interfaces, and the right path to orbital validation.

[VLEO-1_STATUS]
IN_DEVELOPMENT
SSO VLEO • 400km
Launch: Q3/Q4 2027
~8 kg available
~50W • 24.5-29.2V
X-band • 450 Mbps
2-year mission
[WHY_SATELYX]
[email protected]
  • No satellite build required
  • We champion your tech to buyers
  • Catalog access for re-flights
  • 48h response time
mission_inquiry.form

Thank you for your inquiry!

Your mission inquiry has been successfully submitted.

Our team will reach out within 48 hours to discuss your requirements.

Question 1 of 7 Purpose
Check Mission Fit